Monday, March 16, 2009

tracking the progress

Well, if you've been regularly tracking our progress, then if you know that the next picture I promised you is of the barn door track system in our master bedroom.
Jerry, our builder, built the doors for us and we just LOVE how they turned out! We are going to paint them---probably a blue/gray color.

Pictured below you will see the system open. The system closed. And then a close of up just one door.
The door on the left (which is closest to the front of the house) leads to the walk in closet and the door on the right leads to the master bathroom.



Jeremy--aka--Tile Guy: also started this weekend. He's doing a beautiful job with our checkerboard tile. These pictures show the tile laid in the master bathroom and the beginning of the tile in the upstairs guest bathroom. Jeremy will tile the master shower this week -- and we're yet to pick out the floor tile for the downstairs bathroom.
As far as the time line goes, we are thinking that our painter will begin prepping the woodwork this week and probably spray the trim, and paint a couple of the rooms next week. (Taylor and I will also be painting some of the rooms.)
Our floor guys will begin after the painters are done.
Our plan is to be moved in by the end of April!

1 comment: